Shibuya Station in short
Four operators serve the station: JR, Tokyu, Keio and Tokyo Metro. The crossing is directly in front of the Hachiko Exit.
The station is still being rebuilt, and the work is planned in stages until fiscal year 2034. Expect signs, detours and construction around the building for years. Follow the signs, and keep some extra minutes in your schedule when you change trains.

Lines at Shibuya Station
Which operator runs which line.
| Operator | Lines | Metro code |
|---|---|---|
| JR | Yamanote, Saikyo, Shonan-Shinjuku | โ |
| Tokyu | Toyoko, Den-en-toshi | โ |
| Keio | Inokashira | โ |
| Tokyo Metro | Ginza | G01 |
| Tokyo Metro | Hanzomon | Z01 |
| Tokyo Metro | Fukutoshin | F16 |
The Yamanote Line also connects Shibuya with Harajuku, and the Fukutoshin Line serves Meiji-jingumae. See the Harajuku and Omotesando guide for the walk and the shrine.
Hachiko Exit and South Gate
The Hachiko Exit leads straight to the crossing. It is also the busiest gate. JR points to the South Gate as an alternative, about 250 m from the Hachiko square and the crossing. If the Hachiko Exit is packed, walking from the South Gate can be calmer.
The Hachiko statue stands in the Dogenzaka area, close to the crossing and the Hachiko Exit. It is a popular meeting point, but do not count on it every evening. The statue area is planned to be fenced off from 30 October 2026, 6 a.m., until the morning of 1 November. See the Halloween guide and the Hachiko page.

Shibuya walking and food tours
Tours that start near the station, with live prices and availability.
Two sample rides from Shibuya
Adult single fares, Tokyo Metro, as of 1 April 2026.
| Ride | Ride time | IC card | Paper ticket |
|---|---|---|---|
| Shibuya to Asakusa, Ginza Line | 33 minutes | JPY 252 | JPY 260 |
| Shibuya to Ginza, Ginza Line | 15 minutes | JPY 209 | JPY 210 |
The ride time is the timetable time between stations. It leaves out the walk to the platform, waiting and any change of trains. Fares for other JR, Tokyu and Keio rides differ, so check them at the ticket machine or on the route planner you use.
The Asakusa ride takes you to the old temple district. Directions for the other end are on the Senso-ji getting there page.
The station rebuild
Years of work, in stages.
What is planned
The station and the pedestrian network are planned to be largely complete in fiscal year 2030. Phase II of Shibuya Scramble Square, with a middle and a west building, is planned for fiscal year 2031. Further completions run until fiscal year 2034.
What that means for you
Do not plan around a finished station soon. Japanese fiscal years run from April to March, so they do not match calendar years. Shibuya Sky keeps its own opening hours, so check them before you go.
Dates and traffic to know
Seasonal rules and planned changes with dates.
Halloween weekend
Police plan traffic controls from the evening of 30 October 2026 to the early morning of 1 November. Inokashira-dori and Dogenzaka may be affected, depending on the situation. Parking meters around the station are out of service all day. Details are on the Halloween page.
By car
The parking garage at PARCO costs JPY 320 per 30 minutes on weekdays and JPY 400 on weekends and holidays, and is open 07:00 to 24:00. From the north side, you may only turn left into the entrance from Organ-zaka. Turning right is not allowed.
Delays
The line status changes during the day. Check the operator's status page on the day of travel. For the Yamanote Line, the status information covers 04:00 to 02:00.
Where to go next
From the station to the rest of the district.
Shibuya Station: frequently asked questions
Which exit is closest to the Shibuya Crossing?
The Hachiko Exit leads to the crossing. It is crowded, and JR points to the South Gate as an alternative, about 250 m from the Hachiko square and the crossing.
Which lines stop at Shibuya Station?
JR Yamanote, Saikyo and Shonan-Shinjuku, Tokyu Toyoko and Den-en-toshi, Keio Inokashira, and Tokyo Metro Ginza, Hanzomon and Fukutoshin.
How long does the train take from Shibuya to Asakusa?
The Ginza Line timetable gives 33 minutes, at JPY 252 with an IC card or JPY 260 with a paper ticket (as of 1 April 2026). Add time for walking and waiting.
When will the station rebuild be finished?
The work runs in stages. The station and pedestrian network are planned for fiscal year 2030, Scramble Square Phase II for fiscal year 2031 and further parts until fiscal year 2034. Do not count on a finish in 2027.
Is the Hachiko statue always open to visitors?
No. The statue area is planned to be fenced from 30 October 2026, 6 a.m., until the morning of 1 November, with the end time depending on the situation.